
TILE
An independent community meme coin named after the roof tiles of a hanok; pre-launch, with no official contract
$TILE is a community meme coin named after the tiles on a hanok roof. Its motto is one tile and one community member at a time, and the site hosts TILE RUN, a browser game about running across rooftops collecting tiles.
The team says it is a meme coin, not an NFT collection (a public reply on 2026-09-21 and a message to the site operator on 2026-09-28). Its X bio says it is coming soon to GIWA.
As of 2026-10-08 the site says it is pre-launch with no official $TILE contract yet, and that it has no affiliation with GIWA, Upbit or Dunamu. A separate site and account with a similar name exists and should not be confused with this one.
Description from: tileongıwa.xyz · @TileOnGIWA ↗ · the project's own description
Note: As of 2026-11-12 the website does not open (deployment temporarily paused, DEPLOYMENT_DISABLED). The X account kept posting until 2026-11-11.
This list mixes projects' own announcements, tips from others and our own research, and its accuracy is not guaranteed. Being listed is not a recommendation or endorsement, nor does it mean a project is safe from shutdowns, hacks or rug pulls. Check for yourself before taking part.

One tile. One roof. An independent community meme inspired by GIWA.
The project's own Open Graph image and text.
About on X
@TileOnGIWA$TILE is a community driven meme coin inspired by GIWA (기와), the traditional Korean roof tile. 기와의 멋에 커뮤니티의 힘을 더한 밈코인. Coming soon to @GIWA_by_Upbit
- Followers
- 2.17K
- Following
- 16
- Posts
- 93
- Account based in
- Europe
- Connected via
- West Asia App Store
Inferred by X from connection signals, not the team's nationality or legal domicile.
GASOK Phase 3
- Status
- Unconfirmed
- Evidence tier
- User report only
No public GASOK statement was found. This does not mean rejection. No official roster has ever been published, so there is no way to confirm it either way.
What is GASOK Phase 3?
GASOK is Dunamu and Upbit's builder program for GIWA, an incubation running seven months or more. Phase 3 (Aug–Nov 2026) is the "market readiness & launch" stage, aiming at testnet user metrics and a private mainnet deployment. There are five tracks: DeFi/RWA, Consumer/Social, GIWA-Native, AI/Web3, and Mass Adoption.
As of 2026-11-12 the website does not open (deployment temporarily paused, DEPLOYMENT_DISABLED). The X account kept posting until 2026-11-11.
Something wrong or missing on this project? Tell us on Telegram ↗ Partnership enquiries reach us the same way.
Projects in the same category
A content network where people and AI write together, testing paid posts and question bounties with testnet BOUT on GIWA Sepolia
Evidence tier: Self-announced
A crypto tax service that gathers scattered digital-asset trades into one tax ledger; its web service is open behind a login
Evidence tier: Self-announced
Social trading and meme launchpad
Evidence tier: Self-announced